Buyout, submittals, documents and the field — on one register.
Four modules share the same documents, the same classifications and the same audit trail as the takeoff and the estimate. The scope sheet that priced the job is the scope sheet you buy out against.
P-03 · Project controlsWhat each one covers.
Watch the coordination walkthrough
03 / Module
Buyout & Procurement
Scope sheets generated from the estimate, subcontract and purchase-order registers, and budget versus committed on one page. When a scope gap appears at buyout, you can see which quantity it came from.
04 / Module
RFIs & Submittals
AI drafts the RFI from the drawing and the relevant spec section, and drafts submittal transmittals with the right references attached. A person reviews and approves before anything is logged or sent. No autonomous sending.
05 / Module
Document Control
Specifications parsed and classified to CSI division and section, drawing revision tracking, and answers that cite the current sheet rather than the version someone downloaded in March.
06 / Module
Field & Closeout
Daily logs, quality-control records, punch list and closeout compliance, tied back to the same documents and classifications the estimate was built from.
Buyout & Procurement
Every package, budget to award
Commercial package control from frozen Estimate ownership through solicitation, leveling, award, and downstream execution.
| Package | Budget | Bidders | Low bid | Variance | Status |
|---|---|---|---|---|---|
| 03 · Cast-in-place concrete | $110,000 | 0 | — | — | scope ready |
| 05 · Structural steel | $142,500 | 0 | — | — | scope ready |
| 22 · Plumbing | $96,800 | 0 | — | — | scope ready |
Buyout Log · estimate ownership, solicitation, leveling, award and execution
RFIs / Decisions
Questions & Clarifications
Drafted from source gaps, answered with impact, and connected to potential changes.
| Number | Subject | Spec | Origin | Due | Cost | Status |
|---|---|---|---|---|---|---|
| RFI-041 | Connection responsibility | 05 12 00 | spec gap | Oct 03 | — | sent |
| RFI-042 | Sleeve location at Grid C4 | 22 05 00 | drawing conflict | Oct 06 | — | draft |
| RFI-043 | Finish transition detail | 09 65 00 | spec gap | Oct 10 | — | draft |
RFIs / Questions · source gaps, response dates, impact and potential changes
Watch an RFI resolve a conflict
Submittals
Submittal Log
Canonical durable artifacts with source obligations preserved beneath each workflow row.
| Number | Title | Spec | Ball in court | Due | Status |
|---|---|---|---|---|---|
| SUB-005-03 | Structural steel shop drawings | 05 12 00 | Contractor | Oct 08 | GC review |
| SUB-033-02 | Concrete mix design | 03 30 00 | Engineer | Oct 02 | overdue |
| SUB-022-04 | Plumbing fixtures | 22 40 00 | Vendor | Oct 14 | requested vendor |
Submittal Log · canonical requirements, ball in court, due dates and approvals
Watch a submittal move through review
Document Control
Bring in the source
The Document Vault creates the authoritative project file before downstream work begins.
Documents · create the authoritative source record
Field & Closeout
Before anyone breaks ground
Document-derived checks and human-confirmed field readiness stay separate and visible.
Pre-Con & Mobilization · resolve document-derived field gates
Actual PiloBuild screen structure and module states · fictional project data · human decisions remain explicit
AI drafts. A person decides.
Every drafted RFI, submittal and transmittal stops for review and approval. That is not a setting, and it is not a beta limitation we plan to remove.
01 / Draft
Drafted with references
The draft arrives with the drawing detail, the spec section and the revision it relates to, so the reviewer is checking a position rather than assembling one.
02 / Review
Reviewed by a named person
Approval is attributed. The log shows who approved what and when, which is the part that matters when the schedule is being reconstructed months later.
03 / Log
Logged only after approval
Nothing is transmitted to a design team, an owner or a subcontractor until your team has said yes. PiloBuild does not send correspondence on its own.
Why one register beats four tools.
The reason a scope gap costs money is that it crosses systems. It is measured in one tool, priced in a spreadsheet, bought out in a second tool, argued about in email, and discovered in the field. Each handoff drops context.
When buyout, submittals, document control and the field share the takeoff’s classifications and the estimate’s line items, the context travels with the item. That is the whole argument for an operating layer instead of four more point solutions.

See it on one of your projects.
Bring one drawing set and the estimate you already have. You keep everything the pilot produces.