Trade · Masonry · CSI Division 04Block and brick counts that survive a wall-type change.
Masonry takeoff turns a wall elevation into a unit count — block or brick per square foot of net wall area, grout and reinforcing by cell, and control joints by linear foot — and every one of those numbers depends on reading the wall-type tag correctly, not just measuring the wall.
T-02 · MasonryThe drawing-reading problem: net area, not gross area
A masonry wall elevation shows a rectangle, but the quantity that matters is net wall area: gross area minus openings for doors, windows and louvers, each of which is drawn as its own polyline and needs its own subtraction. Miss one opening deduction on a warehouse wall and the block count is off by enough units to matter on the order.
Wall-type tags (a CMU wall tagged "8″ CMU, fully grouted, #5 @ 32″ o.c.") carry the information that turns a wall area into a unit count, a grout volume and a reinforcing schedule — and that tag is usually a leader-line callout pointing at a wall segment, not a value printed on the wall itself.
What gets measured, and in what unit
Six object classes cover a typical masonry package. Each keeps its own unit instead of being folded into a single blended quantity.
| Takeoff object | Unit | How PiloBuild resolves it |
|---|---|---|
| Wall area by type | SF, net of openings | Gross area minus every door, window and louver polyline, grouped by wall-type tag. |
| Unit count | EA (block or brick) | Net SF divided by the coursing and unit size from the wall-type tag, not a flat SF-to-unit ratio. |
| Grout | CY, by cell fill condition | Fully grouted vs. partially grouted cells read from the tag, not assumed uniform across the building. |
| Reinforcing | LF and EA, vertical and horizontal | Bar size and spacing from the wall-type tag or a masonry reinforcing schedule. |
| Control & expansion joints | LF, by joint type | Located from the elevation, since spacing rules vary by wall length and material. |
| Veneer & accessories | SF (veneer), EA (ties, anchors) | Tie spacing and anchor counts by wall height and exposure category. |
Classification, resolved before the quantity is produced
Vector-first geometry gives the exact outline of every wall segment and every opening on the same coordinate space, so net area is gross area minus resolved openings, computed directly rather than estimated with a deduction percentage. Callout resolution ties each wall segment to its wall-type tag, so the unit size, coursing, grout condition and reinforcing spacing used to convert area into a block count and a grout volume come from the tag that actually points at that segment.
Where a wall type changes between the architectural elevation and a structural wall schedule — a common source of masonry change orders — the BOM cross-check flags the mismatch before the mason orders material for the wrong assembly.
What you get back on a masonry package
Quantities by class
Every masonry object above, grouped the way your estimating desk already groups it, with the unit that matches how it is bought.
A geometry audit trail
Each quantity links back to the sheet, the resolved callout or schedule row, and the scale a person confirmed.
A BOM cross-check
Design-intent drawings compared against a subcontractor shop-drawing takeoff on the same scope, with discrepancies listed before they reach the field.
3 questions, specific to masonry
What CSI division does Masonry takeoff fall under?
Primarily CSI Division 04 (Masonry). Related sections we classify against on a typical masonry package include: 04 20 00 Unit Masonry, 04 05 00 Common Work Results for Masonry, 04 22 00 Concrete Unit Masonry.
Does PiloBuild replace our estimator on this trade?
No. PiloBuild produces the measured quantities, grouped and classified the way this page describes, and a bid summary showing the arithmetic behind the cost build-up. Your estimator applies judgment, reviews the classification, and owns the number that goes on the bid. The scale confirmation and the review-and-approve gate exist specifically so a person checks the machine, not the other way around.
What happens when the drawing set is incomplete or the schedule is missing?
Where a callout cannot be resolved — a wall-type tag that does not match any schedule row, a size annotation with no nearby segment to attach to — the item is flagged rather than guessed. An unresolved item is reported to your team for a manual read, not silently dropped or estimated with a default.

Run a pilot on a masonry set.
Bring one drawing set and the estimate you already have. We measure it, you compare it line by line.